Technology — a classification, not a measurement. An on-box language model (qwen3.6:35b-a3b, prompt version 1) read this channel’s own recent posts on 21 October 2026 and assigned it the closest of 31 fixed categories, at 93% confidence. This is a model’s judgement about what the channel is likely to be about, not a fact this register measured the way a subscriber count or a view count is measured — it can be revised on a later pass, and it carries no weight anywhere else on this page. How this classification works, and the other topics.
Growth
8 measurements spanning 48 days, net +10. Dots are measurements; the straight line between them is drawn to join them, not to claim we know the path taken in between — snapshots are recorded only when a count changes, so gaps mean “no change observed”, never “interpolated”. The vertical axis spans 712–730 and does not start at zero.
Measurement log — every subscribers count we have recorded
Measured (UTC)
Subscribers
Change
18 Nov 2026, 06:55
728
+6
5 Nov 2026, 15:39
722
+1
29 Oct 2026, 08:17
721
+2
21 Oct 2026, 09:28
719
+5
14 Oct 2026, 16:40
714
-3
6 Oct 2026, 09:37
717
-1
1 Oct 2026, 08:22
718
no change
1 Oct 2026, 07:47
718
first reading
Engagement
6 posts held, back to 14 April 2026 — the reader has not yet reached the start of this channel’s public history, so older posts may sit further back, unread. Read across 1 page of Telegram’s post history, 20 posts per page.
Nothing published in the last 30 days. ERR and ER are rolling 30-day measures, so there is nothing to compute — we hold 6 posts for this entry, the most recent from 29 September 2026. An engagement rate over an empty window would be a number about nothing.
Reaction mix
49 reactions across 5 posts, in 3 distinct kinds. The most used accounts for 42.9% of them.
Every reaction kind recorded on the sample, most used first
Reaction
Count
Share
Share, drawn
🔥
21
42.9%
❤
19
38.8%
👍
9
18.4%
No sentiment is inferred, and none should be read in. This table is ordered by count and by nothing else. Emoji do not carry stable meaning across languages or communities — 🙏 is thanks in one channel and mourning in another — so we publish which ones were pressed and how often, and pass no judgement on what an audience meant by them.
Precision. Telegram publishes reaction counts per emoji and short-forms each one — 4.34K, 1.2M — so any single kind at or above 1,000 reaches us at three significant figures, and only counts below 1,000 are exact. The shares above are ratios of those figures and carry the same error. This is also why the total here can differ slightly from a reaction total printed elsewhere on the page: both are sums of the same rounded parts, taken over samples with different edges.
Coverage. Reactions were read on 5 of the 6 sampled posts in this sample. Summed by Telegram’s own count on each post — not by adding up the per-emoji breakdown above — those same posts carry 49 reactions in total: the kind of figure the paragraph above means by “a reaction total printed elsewhere on the page”.
Measured over the 6 most recent posts we hold, published 14 April 2026 to 29 September 2026, using the newest reading held for each. Telegram Stars are excluded: they are a payment, not a reaction, and they have their own section.
🇮🇩 Dirgahayu Republik Indonesia ke-81
Mari terus menjaga semangat kemerdekaan untuk Indonesia yang berdaulat, adil, dan makmur.
Merdeka! Merdeka! Merdeka!
Showing the 6 most recent of 6 posts we hold for @ramsprojects. View and reaction counts are the latest single reading for each post, not a live figure, and a recent post is still accumulating both. A view count marked ≈ was rounded by Telegram before we ever saw it — t.me prints views in full below 1,000 and to three significant figures above, so ≈1,200,000 means somewhere between 1,150,000 and 1,249,999. Unmarked counts are exact. Text is reproduced from the public post preview and truncated for length.
Forward network
Republishes
Channels on the register whose posts this channel has forwarded.
Built only from forwarded posts we have actually read, on both sides. Coverage is early and deliberately incomplete: a missing link means we have not read the post that would prove it, never that the relationship does not exist. Counts are distinct forwarded posts observed, so they only ever go up as we read more.
Appears in Telegram’s recommendations for other channels
The reverse of the list above, and a different kind of signal. This does not require this channel to have ever been asked about directly — each row below is a channel we DID ask Telegram about, whose Telegram-generated list happened to include this one. A channel can appear here with an empty list above it, because being named by someone else’s query is independent of having been queried itself.
ReVanced Extended @revancedextended · 22,586 Telegram ranks this channel #13 of 26 here — alongside 25 others — read 1 October 2026
This channel appears in 1 seed channel's Telegram-generated recommendation list in total. Each is Telegram’s list for THAT channel, not this one — see how this is measured.
Cite this entry
A live page changes as we take new readings, so a citation should name the measurement it is based on, not just the URL. The line below cites the subscriber count as measured 18 November 2026 — this
entry's latest reading, not the date you are reading this.
“rams•prjk // updates” (@ramsprojects), 728 subscribers as measured 18 November 2026. Telegram Register, tgregister.com/channel/ramsprojects.
Full measurement history, CC BY 4.0. Every reading this register holds for this entry, not just the latest one, as a dated, downloadable record: CSV · JSON. Free to use with attribution to tgregister.com. Each file carries its own generation timestamp, which is the figure to cite for exactly when the data was retrieved.