Есть гб у кого? проверить кое что @socialfeast
Signed Social Man!ac

Channel
@charmsproject
On this record: Topic · Growth · Engagement · What this channel posts · Reactions · Stars · Posts · Citations · Cite this entry
262subscribers
-38 since we began measuring on 15 August 2026
Risers and fallers across the register · movement among entries of Under 1,000.
| Telegram ID | -1002437113167 |
|---|---|
| Type | Channel |
| Username | @charmsproject |
| Created | 6 October 2024 — measured — dated from the channel’s first post |
| First recorded | 15 August 2026 |
| Last confirmed live | 26 November 2026 |
| Measurements held | 11 |
| Confirmed unchanged | 1 time, most recently 26 November 2026 |
| On Telegram | t.me/charmsproject |
Other / unclassifiable — a classification, not a measurement. An on-box language model (Qwen3.6-35B-A3B-FP8, prompt version 1) read this channel’s own recent posts on 23 September 2026 and assigned it the closest of 31 fixed categories, at 84% confidence. This is a model’s judgement about what the channel is likely to be about, not a fact this register measured the way a subscriber count or a view count is measured — it can be revised on a later pass, and it carries no weight anywhere else on this page. How this classification works, and the other topics.
| Measured (UTC) | Subscribers | Change |
|---|---|---|
| 26 Nov 2026, 11:38 | 262 | -1 |
| 18 Nov 2026, 18:40 | 263 | -1 |
| 28 Oct 2026, 06:59 | 264 | -3 |
| 20 Oct 2026, 16:20 | 267 | -9 |
| 13 Oct 2026, 07:40 | 276 | -9 |
| 3 Oct 2026, 09:16 | 285 | -10 |
| 17 Sept 2026, 23:36 | 295 | -2 |
| 31 Aug 2026, 15:53 | 297 | -1 |
| 24 Aug 2026, 16:36 | 298 | -1 |
| 16 Aug 2026, 17:36 | 299 | -1 |
| 15 Aug 2026, 04:02 | 300 | first reading |
15 posts held, back to 6 October 2024 — the reader has not yet reached the start of this channel’s public history, so older posts may sit further back, unread. Read across 1 page of Telegram’s post history, 20 posts per page.
Nothing published in the last 30 days. ERR and ER are rolling 30-day measures, so there is nothing to compute — we hold 15 posts for this entry, the most recent from 20 December 2024. An engagement rate over an empty window would be a number about nothing.
Measured directly from 3 videos with a duration reading, out of the posts we hold for this channel — not this channel’s whole posting history, only the sample this register has actually read. An exact reading to the second, taken from the post itself rather than from Telegram’s own rounded chrome, so it carries no ≈ mark.
3 reactions across 3 posts, in 3 distinct kinds. The most used accounts for 33.3% of them.
| Reaction | Count | Share | Share, drawn |
|---|---|---|---|
| ❤ | 1 | 33.3% | |
| 👍 | 1 | 33.3% | |
| 👏 | 1 | 33.3% |
No sentiment is inferred, and none should be read in. This table is ordered by count and by nothing else. Emoji do not carry stable meaning across languages or communities — 🙏 is thanks in one channel and mourning in another — so we publish which ones were pressed and how often, and pass no judgement on what an audience meant by them.
Precision. Telegram publishes reaction counts per emoji and short-forms each one — 4.34K, 1.2M — so any single kind at or above 1,000 reaches us at three significant figures, and only counts below 1,000 are exact. The shares above are ratios of those figures and carry the same error. This is also why the total here can differ slightly from a reaction total printed elsewhere on the page: both are sums of the same rounded parts, taken over samples with different edges.
Coverage. Reactions were read on 4 of the 15 sampled posts in this sample. Summed by Telegram’s own count on each post — not by adding up the per-emoji breakdown above — those same posts carry 3 reactions in total: the kind of figure the paragraph above means by “a reaction total printed elsewhere on the page”.
Measured over the 15 most recent posts we hold, published 6 October 2024 to 20 December 2024, using the newest reading held for each. Telegram Stars are excluded: they are a payment, not a reaction, and they have their own section.
A paid reaction is a reader spending Telegram Stars — bought with money — on a post by @charmsproject. Telegram publishes the count on the public post preview alongside ordinary reactions, and this register reads it there. It is the only figure on this site that measures money moving rather than attention.
Stars are not reactions, and the two are never added. They are rendered in the same strip on Telegram and counted in the same shape, but one is a tap and the other is a purchase. The reaction totals and the engagement rate elsewhere on this page exclude every figure in this section, and no rate here is computed against a reaction count.
This is not revenue, and we publish no currency figure. What a Star costs a reader and what it pays a channel are different numbers, Telegram takes a share we cannot observe, and the terms have changed. Converting a Star count into money would be an estimate dressed as a measurement, so the count is where we stop.
Counted over the 15 most recent posts we hold for this entry, published 6 October 2024 to 20 December 2024. Star counts above 1,000 reach us in Telegram’s short form and carry the same three-significant-figure rounding as everything else on this page.
Есть гб у кого? проверить кое что @socialfeast
Signed Social Man!ac
Новый проект сабку
Signed Пират Карибского Моря
Come back Кровавый Пир
Signed Пират Карибского Моря
Photo, posted without a caption
👍1
Signed Пират Карибского Моря
Бл уже второй раз снял вечный сб
Signed Пират Карибского Моря
Сегодня будет бек проекта 🤙
Signed Пират Карибского Моря
@policecommunication i always come back 🤫
Signed Пират Карибского Моря
Скорее всего скоро буду начинать с новой лики, и набивать фейм
👏1
Signed Пират Карибского Моря
Конфликт с saviollas.t.me исчерпан мы поговорили с ним 🤫
Signed Пират Карибского Моря
@JinglebeIIs — next target
Signed Пират Карибского Моря
👌
Signed Пират Карибского Моря
Понедельник готовься дед мороз подарки принесёт ☺️
Signed Пират Карибского Моря
Showing the 12 most recent of 15 posts we hold for @charmsproject. View and reaction counts are the latest single reading for each post, not a live figure, and a recent post is still accumulating both. A view count marked ≈ was rounded by Telegram before we ever saw it — t.me prints views in full below 1,000 and to three significant figures above, so ≈1,200,000 means somewhere between 1,150,000 and 1,249,999. Unmarked counts are exact. Text is reproduced from the public post preview and truncated for length.
Named by 1 registered channel — every channel on the register whose own posts have named this one, by its current username or any other username it currently holds, merged from two separately captured readings of the same fact so a namer caught by only one of them is not missed and a namer both caught is not counted twice. A username this channel has since dropped is not matched — that handle may belong to someone else now, and crediting today’s namer to yesterday’s owner would misattribute it.
Names
Channels on the register whose handles appear in this channel's posts.
A mention is a weaker signal than a forward and is counted separately for that reason — naming a channel is not republishing it, and a handle in a post body is easy to place deliberately. The post counts beside each row below are distinct posts in which the handle appeared, from posts we have read on both sides — the “Named by N registered channels” figure above is a different count, of distinct NAMING CHANNELS rather than posts, and is not the sum of the rows under it.
A live page changes as we take new readings, so a citation should name the measurement it is based on, not just the URL. The line below cites the subscriber count as measured 26 November 2026 — this entry's latest reading, not the date you are reading this.
“Charms Project” (@charmsproject), 262 subscribers as measured 26 November 2026. Telegram Register, tgregister.com/channel/charmsproject.
Full measurement history, CC BY 4.0. Every reading this register holds for this entry, not just the latest one, as a dated, downloadable record: CSV · JSON. Free to use with attribution to tgregister.com. Each file carries its own generation timestamp, which is the figure to cite for exactly when the data was retrieved.