7 Aug 2026, 14:29 UTC48 views4 reactionsread 9 August 2026 Video
Venera Village - Project Update
A fresh look at Venera Village luxury villas, restaurants, the beachfront area, and the latest construction progress across the complex
Venera Hotel is getting closer to opening, while work continues across the surrounding territory and new areas of Venera Village keep taking shape
A beautiful new look at the project and its progress
🔥2❤1👍1
24 Jul 2026, 12:13 UTC100 views7 reactionsread 9 August 2026 Video
Hotel Venera – Construction Update 📍
Another look at the project as we continue moving toward completion
Construction is progressing steadily, with more finishing work completed across the hotel and surrounding
❤5👍1🔥1
18 Jul 2026, 12:18 UTC124 views7 reactionsread 9 August 2026 Video
Palm Paradise – On-site Progress
Work is now focused mainly on the interiors, where more and more villas are reaching their final stage
Take a look at the latest progress and see how Palm Paradise is coming together, both inside and out
❤4🔥2👍1
10 Jul 2026, 15:44 UTC140 views7 reactionsread 9 August 2026 Video
Venera Village — Construction Update🌊
Venera Village is our flagship project on Koh Phangan, bringing together luxury villas, a hotel, two restaurants, and a unique beachfront location
The first phase is now approaching completion. The restaurants are already welcoming guests, the hotel is preparing for its opening, and the entire project is steadily taking its final shape
❤4🔥2👍1
8 Jul 2026, 02:35 UTC118 views5 reactionsread 9 August 2026 Video
Sunset Paradise — Construction Update
Take a look at the latest progress at Sunset Paradise
This update features new aerial views of the project, the surrounding tropical nature, and a closer look at the current stage of construction, including a glimpse inside the villas
Every week, the project moves one step closer to completion
❤3👍1🔥1
3 Jul 2026, 12:36 UTC132 views6 reactionsread 9 August 2026 Video
Tropical Paradise — Construction Update📉
Work across the project continues to move forward
Construction of the main entrance road is progressing, with retaining walls becoming more defined and the future road layout now clearly visible. Step by step, the entrance to the community is taking its final shape
Every update brings Tropical Paradise one step closer to completion
❤4👍1🔥1
26 Jun 2026, 12:48 UTC140 views7 reactionsread 9 August 2026 Video
A closer look at the current works on site🚧
The team is continuing the road preparation and retaining wall construction. The future road layout is already visible: two-way traffic with a landscaped area in the center
Step by step, the territory of Tropical Paradise is becoming more organized and complete
❤5👍1🔥1
26 Jun 2026, 12:44 UTC117 views7 reactionsread 9 August 2026 Photo
Tropical Paradise — Site Progress
The main entrance road is now taking shape, with retaining walls forming along the sides and the central area prepared for future landscaping
These works are an important part of the territory development and overall infrastructure of the project
👍4❤2🔥1
19 Jun 2026, 15:35 UTC135 views7 reactionsread 9 August 2026 Video
HOTEL VENERA — Latest Site Progress🌊
A fresh look at the current progress on site
The children’s playground has been installed, paving works are actively progressing throughout the territory, and palm tree landscaping is now nearly complete
Both hotel buildings have reached completion, with current efforts focused on external works, landscaping, and creating a cohesive environment across the development
Each upda…
❤4🔥2👍1
14 Jun 2026, 12:38 UTC153 views7 reactionsread 9 August 2026 Video
Tropical Paradise – Construction Update 🛠️
A fresh aerial view of the project territory
Current progress includes:
• Retaining wall construction along the road side
• Steel framework installation for the future pool area
• Terrace structures taking shape at Villas 5 & 6
The project continues to move forward as both infrastructure and outdoor spaces are steadily developed
❤5👍1🔥1
13 Jun 2026, 09:03 UTC137 views8 reactionsread 9 August 2026 Video
Sunset Paradise – fresh drone update
The swimming pool is now nearly complete, with the surrounding area already prepared for the future pool deck. The outdoor shower and restroom serving the pool area are also in place
The main entrance steps are taking shape, providing a clear view of how residents will access the complex. Behind the villas, the retaining wall continues to progress and its final form is becoming …
❤6👍1🔥1
6 Jun 2026, 03:22 UTC173 views7 reactionsread 9 August 2026 Video
Palm Paradise – Villa Tour 🏡
Sharing a fresh look at one of the completed villas at Palm Paradise
A quick walkthrough of the finished space, showcasing the architecture, interiors, and atmosphere of the project
❤5👍1🔥1
Showing the 12 most recent of 14 posts we hold for @VeneraDevelopmentgroup. View and reaction counts are the latest single reading for each post, not a live figure, and a recent post is still accumulating both. A view count marked ≈ was rounded by Telegram before we ever saw it — t.me prints views in full below 1,000 and to three significant figures above, so ≈1,200,000 means somewhere between 1,150,000 and 1,249,999. Unmarked counts are exact. Text is reproduced from the public post preview and truncated for length.