Telegram RegisterThe public register of Telegram
Telegram profile photo for Rail Analysis India

Channel

Rail Analysis India

@railanalysisindia

On this record: Topic · Growth · Engagement · Posts · Cite this entry

65subscribers

+5 since we began measuring on 7 August 2026

Risers and fallers across the register · movement among entries of Under 1,000.

Register entry

Telegram ID-1001192199123
TypeChannel
Username@railanalysisindia
CreatedBetween 1 March 2018 and 31 July 2021 — estimated from Telegram’s id allocation, not measured. How this range is calculated.
First recorded10 August 2026
Last confirmed live13 October 2026
Measurements held8
Confirmed unchanged1 time, most recently 13 October 2026
On Telegramt.me/railanalysisindia

Topic

Other / unclassifiable — a classification, not a measurement. An on-box language model (Qwen3.6-35B-A3B-FP8, prompt version 1) read this channel’s own recent posts on 28 September 2026 and assigned it the closest of 31 fixed categories, at 75% confidence. This is a model’s judgement about what the channel is likely to be about, not a fact this register measured the way a subscriber count or a view count is measured — it can be revised on a later pass, and it carries no weight anywhere else on this page. How this classification works, and why it has no browse page of its own yet.

Growth

6066637 August 2026 — 60 subscribers10 August 2026 — 60 subscribers16 August 2026 — 61 subscribers24 August 2026 — 62 subscribers10 September 2026 — 63 subscribers18 September 2026 — 64 subscribers4 October 2026 — 66 subscribers13 October 2026 — 65 subscribers657 August 202613 October 2026
8 measurements spanning 66 days, net +5. Dots are measurements; the straight line between them is drawn to join them, not to claim we know the path taken in between — snapshots are recorded only when a count changes, so gaps mean “no change observed”, never “interpolated”. The vertical axis spans 59–67 and does not start at zero.
Measurement log — every subscribers count we have recorded
Measured (UTC)SubscribersChange
13 Oct 2026, 08:0565-1
4 Oct 2026, 02:3766+2
18 Sept 2026, 10:1864+1
10 Sept 2026, 16:3763+1
24 Aug 2026, 01:5362+1
16 Aug 2026, 19:4661+1
10 Aug 2026, 05:1660no change
7 Aug 2026, 23:1160first reading

Engagement

16 posts held, back to 3 August 2026 — the reader has not yet reached the start of this channel’s public history, so older posts may sit further back, unread. Read across 1 page of Telegram’s post history, 20 posts per page.

Nothing published in the last 30 days. ERR and ER are rolling 30-day measures, so there is nothing to compute — we hold 16 posts for this entry, the most recent from 8 August 2026. An engagement rate over an empty window would be a number about nothing.

Recent posts

8 Aug 2026, 11:20 UTC4 viewsread 10 August 2026

Stay tuned and follow us for more engaging questions like this. Correct answer: Hydrogen fuel cell technology

8 Aug 2026, 10:25 UTC4 viewsread 10 August 2026
Photo

Rail Vikas Nigam Limited has achieved the breakthrough of Tunnel-1 on the Yavatmal–Nanded New Line Project in Maharashtra, completing excavation of all five tunnels. The milestone reflects effective planning, precise construction and strong safety practices. - It represents a significant advancement in the development | Read more: https://railanalysis.in/rail-news/rvnl-achieved-tunnel-1-breakthrough-marking-completi…

8 Aug 2026, 07:24 UTC4 viewsread 10 August 2026
Photo

NHSRCL has signed a contract with Avadh Rail Infra Ltd., in consortium with South Korea’s Kumchun System Company Ltd., for specialised rolling stock maintenance machinery for the Mumbai–Ahmedabad High-Speed Rail Project. - The agreement strengthens India’s high-speed rail maintenance ecosystem |Read more: https://railanalysis.in/metro/nhsrcl-signs-contract-with-kcs-avadh-consortium-for-rolling-stock-maintenance-mach…

7 Aug 2026, 11:30 UTC7 viewsread 10 August 2026
Photo

Maharashtra Metro Rail Corporation Limited (MAHA-METRO) has invited bids for the design, manufacture, supply, testing and commissioning of metro rolling stock for Nagpur Metro Phase-2 and Pune Metro Phase-2. The tender also includes a 15-year maintenance contract and personnel training. - It consist conversion of Pune Metro’s existing 3-car trainsets into 6-car formations | Read more: https://railanalysis.in/tender/…

7 Aug 2026, 05:59 UTC5 viewsread 10 August 2026
Photo

The Gurugram Metro project has reached a significant construction milestone with the successful erection of its first pier cap, marking steady progress in the development of the elevated corridor. The achievement reflects GMRL’s commitment to timely execution, engineering excellence and construction quality. - It enhances urban mobility for the rapidly growing city | Read more: https://railanalysis.in/metro/gurugram…

6 Aug 2026, 11:49 UTC6 viewsread 10 August 2026
Photo

Indian Railways has approved a new daily Express service between Chhatrapati Shivaji Maharaj Terminus and Sawantwadi Road, strengthening connectivity across Maharashtra’s Konkan region. Covering around 510 km, the service will connect Mumbai, Thane, Panvel, Ratnagiri, Sindhudurg and several key towns. - It supporting tourism, business, education and regional mobility | Read more: https://railanalysis.in/rail-news/in…

6 Aug 2026, 11:10 UTC6 viewsread 10 August 2026
Photo

Shri U. Subba Rao assumed charge as General Manager of Southern Railway on 1st August 2026, bringing extensive experience across Indian Railways’ zonal networks and production units. A senior IRSME officer, he has held several key leadership positions. - He is recognised for driving operational excellence and innovation | Read more: https://railanalysis.in/appointment/shri-u-subba-rao-appointed-as-general-manager-of…

6 Aug 2026, 07:54 UTC5 viewsread 10 August 2026
Photo

Jupiter Wagons Limited has entered into a strategic partnership with Italy’s Lucchini RS and SIMEST to develop India’s first fully integrated private-sector railwheel manufacturing platform. The approximately €28 million investment will strengthen domestic capabilities in railway wheels, axles and wheelsets. - It will support technology transfer, exports and India-Italy industrial cooperation | Read more: https://ra…

5 Aug 2026, 12:08 UTC8 viewsread 10 August 2026
Photo

Integral Coach Factory (ICF), Chennai, has awarded two major contracts worth over Rs. 98 crore for the supply, installation, testing and commissioning of On-board KAVACH equipment. - The orders have been awarded to HBL and Kernex Microsystems (India) Limited | Read more: https://railanalysis.in/rail-news/icf-awards-kavach-4-0-contracts-worth-over-rs-98-crore-to-hbl-and-kernex-microsystems/ For regular updates, Subs…

5 Aug 2026, 09:32 UTC11 viewsread 10 August 2026

Stay tuned and follow us for more engaging questions like this. Correct answer: NHSRCL

Showing the 12 most recent of 16 posts we hold for @railanalysisindia. View and reaction counts are the latest single reading for each post, not a live figure, and a recent post is still accumulating both. A view count marked ≈ was rounded by Telegram before we ever saw it — t.me prints views in full below 1,000 and to three significant figures above, so ≈1,200,000 means somewhere between 1,150,000 and 1,249,999. Unmarked counts are exact. Text is reproduced from the public post preview and truncated for length.

Cite this entry

A live page changes as we take new readings, so a citation should name the measurement it is based on, not just the URL. The line below cites the subscriber count as measured 13 October 2026 — this entry's latest reading, not the date you are reading this.

“Rail Analysis India” (@railanalysisindia), 65 subscribers as measured 13 October 2026. Telegram Register, tgregister.com/channel/railanalysisindia.

Full measurement history, CC BY 4.0. Every reading this register holds for this entry, not just the latest one, as a dated, downloadable record: CSV · JSON. Free to use with attribution to tgregister.com. Each file carries its own generation timestamp, which is the figure to cite for exactly when the data was retrieved.